On one of the few rainy days we have here in Los Angeles and we had a packaged Heating and Air Conditioning unit to install on a the roof of a 4 story condominium.
The guys worked hard in a tricky situation. See the high voltage electrical line coming from the utility pole and hanging across the roof? The crane operator had to weave his crane though the tightest spot to lift the unit.
I felt really proud of the work we did today. Great job Armondo and Jose.